The 24 mega projects for development of Ulaanbaatar will include the construction and operation of the 24.3 km long 'Uuduu Temuulekh' bridge in 2025-2028. “The Nomtiin am” in Zurnmod city, Tuv aimag is where the bridge called 'Uuduu Temuulekh' will continue from. The bridge, which is 24.3 km long, will comprise 1,230 meters that will be supported by steel cable-stayed structures. The preliminary design indicates that the road is 7.27 km long, the tunnel is 15.8 km long, and the bridge has four lanes. The average speed of traffic will be increased by 12% by building the 'Uuduu Temuulekh Bridge'.
MEDIA AND PUBLIC RELATIONS DEPARTMENT OF MAYOR’S OFFICE OF ULAANBAATAR CITY
ХХЗХ-ны журмын дагуу зүй зохисгүй зарим үг, хэллэгийг хязгаарласан тул ТА сэтгэгдэл бичихдээ хууль зүйн болон ёс суртахууны хэм хэмжээг хүндэтгэнэ үү. Хэм хэмжээг зөрчсөн сэтгэгдэлийг админ устгах эрхтэй.
Сэтгэгдэл бичигдээгүй байна